Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Pellets
NAICS 333131: Mining Machinery and Equipment Manufacturing
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 6
Plant Area 290,000
ft2
Annual Production 31,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,840 1,645,520
kWh
Electricity Demand $38,435 5,043
kW-mo/yr
Electricity Fees $10,419 -
Natural Gas $167,483 29,268
MMBtu
LPG $7,200 306
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $280,868 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $139,478

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Wood Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 4.132: Purchase new equipment to reduce material use / cost $32,340 - - - - - - $840 - - $31,500
02 4.111: Add equipment/ operators to reduce production bottleneck $107,138 $55,641 $38
713
kWh
- - - - $107,100 - - -
03 4.114: Add/modify equipment to improve drying process $125,546 $300,000 $2,502
47,113
kWh
- $114,208
-
MMBtu
- $(-52,316.0)
-
MMBtu
$61,152 - - -
04 2.8227: Adjust / maintain fork lift trucks for most efficient operation $11,970 $41,000 $(-1,492.0)
(-28,100)
kWh
$(-2,513.0)
-
kW-mo/yr
- $7,200
-
MMBtu
- - $8,775 - -
05 2.2511: Insulate bare equipment $518 $135 - - $518
-
MMBtu
- - - - - -
06 2.7273: Install desiccant humidity control system $2,698 $1,220 - - $2,698
-
MMBtu
- - - - - -
07 2.7134: Use photocell controls $658 $966 $464
8,738
kWh
- - - - - $37 $157 -
TOTAL RECOMMENDED $280,868 $398,962 $1,512
28,464
kWh
$(-2,513.0)
-
kW-mo/yr
$117,424
-
MMBtu
$7,200
-
MMBtu
$(-52,316.0)
-
MMBtu
$169,092 $8,812 $157 $31,500
TOTAL IMPLEMENTED $139,478 $55,641 $38
713
kWh
- - - - $107,940 - - $31,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Wood Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs