328
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Mining machinery and equipment, except oil and gas field machinery and equipment | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UU0025 #03 Y:2002 | 03 | 2002 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,913 | $260 | |
| UU0025 #02 Y:2002 | 02 | 2002 | Optimize plant power factor | $3,455 | $3,500 | |
| UU0025 #01 Y:2002 | 01 | 2002 | Utilize higher efficiency lamps and/or ballasts | $4,405 | $13,567 | |
| SU0114 #06 Y:2001 | 06 | 2001 | Convert to electrostatic powder coating | $3,823 | $6,930 | |
| SU0114 #05 Y:2001 | 05 | 2001 | Install compressor air intakes in coolest locations | $88 | $115 | |
| SU0114 #04 Y:2001 | 04 | 2001 | Install vinyl strip / high speed / air curtain doors | $1,977 | $1,030 | |
| SU0114 #03 Y:2001 | 03 | 2001 | Reduce illumination to minimum necessary levels | $4,310 | $30 | |
| SU0114 #02 Y:2001 | 02 | 2001 | Reduce the pressure of compressed air to the minimum required | $508 | - | |
| SU0114 #01 Y:2001 | 01 | 2001 | Replace existing equipment with more suitable substitutes | $26,000 | $24,320 | |
| WI0399 #10 Y:2001 | 10 | 2001 | Utilize energy-efficient belts and other improved mechanisms | $1,149 | $2,009 | |
| WI0399 #09 Y:2001 | 09 | 2001 | Install equipment (eg compactor) to reduce disposal costs | $1,549 | - | |
| WI0399 #08 Y:2001 | 08 | 2001 | Use waste heat from flue gases to heat space conditioning air | $3,805 | $11,500 | |
| WI0399 #07 Y:2001 | 07 | 2001 | Replace cloth rags with paper towels | $6,301 | - | |
| WI0399 #06 Y:2001 | 06 | 2001 | Distill contaminated solvents for reuse | $6,914 | $4,000 | |
| WI0399 #05 Y:2001 | 05 | 2001 | Use or replace with energy efficient substitutes | $12,894 | $62,046 | |
| WI0399 #04 Y:2001 | 04 | 2001 | Convert to high volume low pressure (hvlp) paint guns | $10,208 | $4,500 | |
| WI0399 #03 Y:2001 | 03 | 2001 | Shift from daytime to nighttime operation | $24,740 | - | |
| WI0399 #02 Y:2001 | 02 | 2001 | Improve air circulation with destratification fans / other methods | $10,170 | $8,874 | |
| WI0399 #01 Y:2001 | 01 | 2001 | Install timers and/or thermostats | $31,173 | $2,000 | |
| WV0168 #11 Y:1999 | 11 | 1999 | Clear and rent existing space | $849 | $120 |