Assessment Year | 2001 |
---|---|
Principal Product | Industrial Process Equipment |
NAICS |
n/a
|
SIC | 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment |
Sales Range | $1 M to 5M |
# of Employees | 37 |
Plant Area |
43,000
ft2
|
Annual Production | 0
pieces
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $29,139 | 734,299 |
kWh
|
$0.040 |
Electricity Demand | $22,155 | 2,514 |
kW-mo/yr
|
$8.81 |
Electricity Fees | $9,154 | - |
|
- |
Natural Gas | $13,141 | 1,989 |
MMBtu
|
$6.61 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,706 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,818 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.652: Replace existing equipment with more suitable substitutes | $26,000 | $24,320 | - | - | - | - | $26,000 | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $508 | - |
$508
12,799
kWh
|
- | - | - | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $4,310 | $30 |
$2,407
60,174
kWh
|
$1,903
-
kW-mo/yr
|
- | - | - | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,977 | $1,030 |
$391
9,781
kWh
|
- |
$1,586
-
MMBtu
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $88 | $115 |
$88
2,202
kWh
|
- | - | - | - | |
06 | 3.2121: Convert to electrostatic powder coating | $3,823 | $6,930 | - | - | - |
$3,823
-
gal
|
- | |
TOTAL RECOMMENDED | $36,706 | $32,425 |
$3,394
84,956
kWh
|
$1,903
-
kW-mo/yr
|
$1,586
-
MMBtu
|
$3,823
-
gal
|
$26,000 | ||
TOTAL IMPLEMENTED | $4,818 | $30 |
$2,915
72,973
kWh
|
$1,903
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs