ITAC Assessment: SU0114
ITAC logo
ITAC Assessment: SU0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Industrial Process Equipment
NAICS
n/a
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $1
M
to 5
M
# of Employees 37
Plant Area 43,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 2,860
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,139 734,299
kWh
Electricity Demand $22,155 2,514
kW-mo/yr
Electricity Fees $9,154 -
Natural Gas $13,141 1,989
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,706 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,818

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings
01 4.652: Replace existing equipment with more suitable substitutes $26,000 $24,320 - - - - $26,000
02 2.4231: Reduce the pressure of compressed air to the minimum required $508 - $508
12,799
kWh
- - - -
03 2.7111: Reduce illumination to minimum necessary levels $4,310 $30 $2,407
60,174
kWh
$1,903
-
kW-mo/yr
- - -
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,977 $1,030 $391
9,781
kWh
- $1,586
-
MMBtu
- -
05 2.4221: Install compressor air intakes in coolest locations $88 $115 $88
2,202
kWh
- - - -
06 3.2121: Convert to electrostatic powder coating $3,823 $6,930 - - - $3,823
-
gal
-
TOTAL RECOMMENDED $36,706 $32,425 $3,394
84,956
kWh
$1,903
-
kW-mo/yr
$1,586
-
MMBtu
$3,823
-
gal
$26,000
TOTAL IMPLEMENTED $4,818 $30 $2,915
72,973
kWh
$1,903
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs