ITAC Assessment: WV0168
ITAC logo
ITAC Assessment: WV0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Hydraulic cylinders/Pneumatic valves
NAICS
n/a
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 108
Plant Area 87,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,290
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,408 1,170,574
kWh
Fuel Oil #2 $48,362 1,704
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,418 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,543

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.2511: Insulate bare equipment $5,946 $5,087 - $5,946
-
MMBtu
- - - -
02 2.7144: Install spectral reflectors / delamp $15,153 $38,400 $15,153
266,999
kWh
- - - - -
03 2.4314: Use synthetic lubricant $1,216 $1,300 $1,216
33,705
kWh
- - - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $109 $60 $109
2,052
kWh
- - - - -
05 2.6218: Turn off equipment when not in use $982 - $982
17,292
kWh
- - - - -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $1,824 $720 - - - $1,824
-
lb
- -
07 2.4323: Use optimum size and capacity equipment $420 $120 - - - - - $420
08 3.5316: Contract a wood pallet recycling company $130 $40 - - - $130
-
lb
- -
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,610 $3,500 - - - $1,610
-
lb
- -
10 3.2123: Convert to high volume low pressure (hvlp) paint guns $6,179 $16,000 - - $6,179
-
gal
- - -
11 4.521: Clear and rent existing space $849 $120 - - - - $849 -
TOTAL RECOMMENDED $34,418 $65,347 $17,460
320,048
kWh
$5,946
-
MMBtu
$6,179
-
gal
$3,564
-
lb
$849 $420
TOTAL IMPLEMENTED $9,543 $6,667 $2,198
50,997
kWh
$5,946
-
MMBtu
- $130
-
lb
$849 $420
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs