Assessment Year | 2006 |
---|---|
Principal Product | Machine Parts and Metal Stamling |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
85,000
ft2
|
Annual Production | 57,224,700
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $66,802 | 1,428,360 |
kWh
|
$0.047 |
Electricity Demand | $8,563 | 4,094 |
kW-mo/yr
|
$2.09 |
Natural Gas | $16,789 | 1,572 |
MMBtu
|
$10.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $103,640 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $99,911 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $96,779 | $48,000 | - | - |
$6,299
-
MMBtu
|
$90,480 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,132 | $1,000 |
$2,884
61,624
kWh
|
$248
-
kW-mo/yr
|
- | - | |
03 | 2.7135: Install occupancy sensors | $2,072 | $225 |
$1,917
40,960
kWh
|
$155
-
kW-mo/yr
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $789 | $3,540 |
$648
13,847
kWh
|
$141
-
kW-mo/yr
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $638 | - |
$587
12,537
kWh
|
$51
-
kW-mo/yr
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $230 | $300 |
$197
4,201
kWh
|
$33
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $103,640 | $53,065 |
$6,233
133,169
kWh
|
$628
-
kW-mo/yr
|
$6,299
-
MMBtu
|
$90,480 | ||
TOTAL IMPLEMENTED | $99,911 | $49,000 |
$2,884
61,624
kWh
|
$248
-
kW-mo/yr
|
$6,299
-
MMBtu
|
$90,480 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs