ITAC Assessment: RU0035
ITAC logo
ITAC Assessment: RU0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product RIGID PVC PRODUCTS
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 123
Plant Area
n/a
Annual Production 22,500,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $597,895 9,919,109
kWh
Natural Gas $123,166 19,975
MMBtu
Fuel Oil #2 $70,637 19,390
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,842 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,841

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,016 $400 $3,016
50,410
kWh
-
02 2.4312: Improve lubrication practices $3,797 $1,600 $3,797
63,306
kWh
-
03 2.7243: Improve air circulation with destratification fans / other methods $2,084 $2,520 $(-200.0)
(-3,224)
kWh
$2,284
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $2,825 $2,500 - $2,825
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $35,120 $25,000 - $35,120
-
MMBtu
TOTAL RECOMMENDED $46,842 $32,020 $6,613
110,492
kWh
$40,229
-
MMBtu
TOTAL IMPLEMENTED $5,841 $2,900 $3,016
50,410
kWh
$2,825
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs