865
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Construction machinery and equipment | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| CL1902 #01 Y:2018 | 01 | 2018 | Utilize higher efficiency lamps and/or ballasts | $29,975 | $18,832 | |
| OK0998 #12 Y:2018 | 12 | 2018 | Reduce space conditioning during non-working hours | $2,003 | - | |
| OK0998 #11 Y:2018 | 11 | 2018 | Replace existing hvac unit with high efficiency model | $2,712 | - | |
| OK0998 #10 Y:2018 | 10 | 2018 | Optimize plant power factor | $11,401 | $14,332 | |
| OK0998 #09 Y:2018 | 09 | 2018 | Reduce the pressure of compressed air to the minimum required | $1,516 | - | |
| OK0998 #08 Y:2018 | 08 | 2018 | Install compressor air intakes in coolest locations | $3,330 | $1,074 | |
| OK0998 #07 Y:2018 | 07 | 2018 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,784 | $2,853 | |
| OK0998 #06 Y:2018 | 06 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $14,022 | $13,860 | |
| OK0998 #05 Y:2018 | 05 | 2018 | Use waste heat from hot flue gases to preheat | $4,207 | $21,000 | |
| OK0998 #04 Y:2018 | 04 | 2018 | Analyze flue gas for proper air/fuel ratio | $5,603 | $400 | |
| OK0998 #03 Y:2018 | 03 | 2018 | Recover waste heat from equipment | $24,407 | $30,000 | |
| OK0998 #02 Y:2018 | 02 | 2018 | Install vinyl strip / high speed / air curtain doors | $24,200 | $6,920 | |
| OK0998 #01 Y:2018 | 01 | 2018 | Utilize higher efficiency lamps and/or ballasts | $92,926 | $356,802 | |
| BS0114 #07 Y:2018 | 07 | 2018 | Use solar heat to make electricty | $8,591 | $166,500 | |
| BS0114 #06 Y:2018 | 06 | 2018 | Eliminate leaks in inert gas and compressed air lines/ valves | $304 | $337 | |
| BS0114 #05 Y:2018 | 05 | 2018 | Reduce the pressure of compressed air to the minimum required | $601 | $7 | |
| BS0114 #04 Y:2018 | 04 | 2018 | Utilize higher efficiency lamps and/or ballasts | $4,503 | $11,880 | |
| BS0114 #03 Y:2018 | 03 | 2018 | Utilize energy-efficient belts and other improved mechanisms | $423 | $250 | |
| BS0114 #02 Y:2018 | 02 | 2018 | Convert to electrostatic powder coating | $26,520 | $21,600 | |
| BS0114 #01 Y:2018 | 01 | 2018 | Use waste heat from hot flue gases to preheat | $4,222 | $21,742 |