Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

860

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Construction machinery and equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
ME0221 #06 Y:1997 Purchase equipment instead of leasing $561 $1,283
ME0221 #05 Y:1997 Install compressor air intakes in coolest locations $883 $250
ME0221 #04 Y:1997 Reduce ventilation air $1,803 $6,000
ME0221 #03 Y:1997 Utilize energy-efficient belts and other improved mechanisms $1,827 $2,398
ME0221 #02 Y:1997 Use heat in flue gases to preheat products or materials $8,031 $17,000
ME0221 #01 Y:1997 Utilize higher efficiency lamps and/or ballasts $8,462 $33,192
IA0167 #08 Y:1997 Install compressor air intakes in coolest locations $263 $500
IA0167 #07 Y:1997 Reduce the pressure of compressed air to the minimum required $2,120 $25
IA0167 #06 Y:1997 Eliminate leaks in inert gas and compressed air lines/ valves $775 $204
IA0167 #05 Y:1997 Utilize higher efficiency lamps and/or ballasts $1,493 $1,484
IA0167 #04 Y:1997 Utilize higher efficiency lamps and/or ballasts $7,537 $36,506
IA0167 #03 Y:1997 Utilize higher efficiency lamps and/or ballasts $7,635 $18,214
IA0167 #02 Y:1997 Replace existing equipment with more suitable substitutes $20,790 $71,000
IA0167 #01 Y:1997 Convert to electrostatic powder coating $111,000 $7,800
OD0087 #06 Y:1997 Utilize other methods to remove contaminants $9,461 $12,800
OD0087 #05 Y:1997 Burn waste oil for heat $1,885 $3,091
OD0087 #04 Y:1997 Eliminate leaks in inert gas and compressed air lines/ valves $1,205 $1,189
OD0087 #03 Y:1997 Upgrade controls on compressors $783 $560
OD0087 #02 Y:1997 Use most efficient type of electric motors $682 $161
OD0087 #01 Y:1997 Utilize higher efficiency lamps and/or ballasts $542 $1,018