ITAC Assessment: ME0221
ITAC logo
ITAC Assessment: ME0221
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product snowplows
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 83,145
ft2
Annual Production 19,000
pieces
Production Hrs. Annual 5,330
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $220,639 3,018,757
kWh
Electricity Demand $87,095 8,827
kW-mo/yr
Electricity Fees $6,054 -
LPG $218,840 29,638
MMBtu
Fuel Oil #2 $19,163 2,831
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,882 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,462 $33,192 n/a $5,813
82,943
kWh
$2,649
-
kW-mo/yr
- -
02 2.2424: Use heat in flue gases to preheat products or materials $8,031 $17,000 n/a - - $8,031
-
MMBtu
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,827 $2,398 n/a $1,827
26,084
kWh
- - -
04 2.7314: Reduce ventilation air $1,803 $6,000 n/a - - $1,803
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $883 $250 n/a $883
12,603
kWh
- - -
06 4.231: Purchase equipment instead of leasing $561 $1,283 n/a - - - $561
07 2.2511: Insulate bare equipment $315 $264 n/a - - $315
-
MMBtu
-
TOTAL RECOMMENDED $21,882 $60,387 $8,523
121,630
kWh
$2,649
-
kW-mo/yr
$10,149
-
MMBtu
$561
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs