Assessment Year | 1997 |
---|---|
Principal Product | Service line equipment |
NAICS |
n/a
|
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $100 M to 500M |
# of Employees | 1,080 |
Plant Area |
780,000
ft2
|
Annual Production | 8,000
pieces
|
Production Hrs. Annual | 2,496
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $887,181 | 17,061,255 |
kWh
|
$0.052 |
Electricity Demand | $175,471 | 47,120 |
kW-mo/yr
|
$3.72 |
Electricity Fees | $1,680 | - |
|
- |
Natural Gas | $292,305 | 96,259 |
MMBtu
|
$3.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $461,093 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $446,393 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3192: Use fossil fuel powered generator during peak demand periods | $285,720 | $575,000 | - |
$39,361
-
kW-mo/yr
|
$(-187,913.0)
-
MMBtu
|
- | - | $56,008 | $378,264 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $128,530 | $202,500 |
$141,102
2,310,375
kWh
|
- |
$(-7,658.0)
-
MMBtu
|
- | - | $(-4,914.0) | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,249 | $124,654 |
$6,478
124,560
kWh
|
$2,065
-
kW-mo/yr
|
- | - | - | $(-1,294.0) | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $9,484 | $18,600 |
$12,223
235,053
kWh
|
- |
$(-2,739.0)
-
MMBtu
|
- | - | - | - | |
05 | 4.514: Re-arrange equipment layout to reduce handling costs | $6,240 | $268,000 | - | - | - | - | - | $6,240 | - | |
06 | 3.1227: Use counter-current rinsing to reduce rinse water volume (gravure) | $5,542 | $27,375 | - | - | - |
$11,112
-
Tgal
|
- | $(-5,570.0) | - | |
07 | 3.1227: Use counter-current rinsing to reduce rinse water volume (gravure) | $5,196 | $1,000 | - | - |
$1,432
-
MMBtu
|
$3,764
-
Tgal
|
- | - | - | |
08 | 2.2437: Recover waste heat from equipment | $3,814 | $732 | - | - |
$3,814
-
MMBtu
|
- | - | - | - | |
09 | 2.2511: Insulate bare equipment | $3,414 | $2,250 |
$3,414
65,651
kWh
|
- | - | - | - | - | - | |
10 | 2.2511: Insulate bare equipment | $1,464 | $485 |
$1,464
28,136
kWh
|
- | - | - | - | - | - | |
11 | 3.1227: Use counter-current rinsing to reduce rinse water volume (gravure) | $2,350 | $35,000 | - | - | - |
$2,350
-
Tgal
|
- | - | - | |
12 | 2.2511: Insulate bare equipment | $1,232 | $1,004 | - | - |
$1,232
-
MMBtu
|
- | - | - | - | |
13 | 3.5316: Contract a wood pallet recycling company | $858 | - | - | - | - | - |
$858
-
lb
|
- | - | |
TOTAL RECOMMENDED | $461,093 | $1,256,600 |
$164,681
2,763,775
kWh
|
$41,426
-
kW-mo/yr
|
$(-191,832.0)
-
MMBtu
|
$17,226
-
Tgal
|
$858
-
lb
|
$50,470 | $378,264 | ||
TOTAL IMPLEMENTED | $446,393 | $949,861 |
$159,803
2,669,988
kWh
|
$41,426
-
kW-mo/yr
|
$(-193,064.0)
-
MMBtu
|
$14,876
-
Tgal
|
$858
-
lb
|
$44,230 | $378,264 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs