Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,891

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Construction, mining, and materials handling
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0087 #06 Y:2012 Utilize energy-efficient belts and other improved mechanisms $2,878 $1,875
UA0087 #05 Y:2012 Use most efficient type of electric motors $5,599 $3,290
UA0087 #04 Y:2012 Install timers and/or thermostats $10,082 $1,700
UA0087 #03 Y:2012 Install compressor air intakes in coolest locations $2,286 $1,843
UA0087 #02 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $7,463 $2,000
UA0087 #01 Y:2012 Reduce the pressure of compressed air to the minimum required $10,153 $960
NC0457 #06 Y:2012 Use heat in flue gases to preheat products or materials $2,161 $2,000
NC0457 #05 Y:2012 Eliminate or reduce compressed air usage $3,516 -
NC0457 #04 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $508 $400
NC0457 #03 Y:2012 Lower ceiling to reduce conditioned space $19,472 $40,000
NC0457 #02 Y:2012 Install occupancy sensors $415 $525
NC0457 #01 Y:2012 Utilize higher efficiency lamps and/or ballasts $1,926 $7,711
AM0610 #08 Y:2012 Utilize higher efficiency lamps and/or ballasts $485 $275
AM0610 #07 Y:2012 Utilize higher efficiency lamps and/or ballasts $485 $275
AM0610 #06 Y:2012 Use synthetic lubricant $715 -
AM0610 #05 Y:2012 Apply for tax-free status for energy purchases $13,000 $1,300
AM0610 #04 Y:2012 Optimize plant power factor $6,000 $13,190
AM0610 #03 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $7,515 $1,500
AM0610 #02 Y:2012 Install skylights $8,500 $2,560
AM0610 #01 Y:2012 Utilize higher efficiency lamps and/or ballasts $28,900 $21,800