Assessment Year | 2012 |
---|---|
Principal Product | Escalators |
NAICS | 333921: Elevator and Moving Stairway Manufacturing |
SIC | 3534: Elevators and Moving Stairways |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
150,000
ft2
|
Annual Production | 500
pieces
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $157,212 | 3,098,000 |
kWh
|
$0.051 |
Electricity Demand | $89,827 | 10,588 |
kW-mo/yr
|
$8.48 |
Natural Gas | $85,902 | 9,895 |
MMBtu
|
$8.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,998 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,365 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,926 | $7,711 |
$1,196
23,535
kWh
|
$942
-
kW-mo/yr
|
- | $(-212.0) | |
02 | 2.7135: Install occupancy sensors | $415 | $525 |
$415
8,187
kWh
|
- | - | - | |
03 | 2.7292: Lower ceiling to reduce conditioned space | $19,472 | $40,000 |
$7,520
148,033
kWh
|
$11,952
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $508 | $400 |
$284
5,595
kWh
|
$224
-
kW-mo/yr
|
- | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $3,516 | - |
$1,965
38,679
kWh
|
$1,551
-
kW-mo/yr
|
- | - | |
06 | 2.2424: Use heat in flue gases to preheat products or materials | $2,161 | $2,000 | - | - |
$2,161
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $27,998 | $50,636 |
$11,380
224,029
kWh
|
$14,669
-
kW-mo/yr
|
$2,161
-
MMBtu
|
$(-212.0) | ||
TOTAL IMPLEMENTED | $6,365 | $8,636 |
$3,860
75,996
kWh
|
$2,717
-
kW-mo/yr
|
- | $(-212.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs