ITAC Assessment: NC0457
ITAC logo
ITAC Assessment: NC0457
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Escalators
NAICS 333921: Elevator and Moving Stairway Manufacturing
SIC 3534: Elevators and Moving Stairways
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 150,000
ft2
Annual Production 500
pieces
Production Hrs. Annual 2,500
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,212 3,098,000
kWh
Electricity Demand $89,827 10,588
kW-mo/yr
Natural Gas $85,902 9,895
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,998 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,365

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,926 $7,711 $1,196
23,535
kWh
$942
-
kW-mo/yr
- $(-212.0)
02 2.7135: Install occupancy sensors $415 $525 $415
8,187
kWh
- - -
03 2.7292: Lower ceiling to reduce conditioned space $19,472 $40,000 $7,520
148,033
kWh
$11,952
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $508 $400 $284
5,595
kWh
$224
-
kW-mo/yr
- -
05 2.4239: Eliminate or reduce compressed air usage $3,516 - $1,965
38,679
kWh
$1,551
-
kW-mo/yr
- -
06 2.2424: Use heat in flue gases to preheat products or materials $2,161 $2,000 - - $2,161
-
MMBtu
-
TOTAL RECOMMENDED $27,998 $50,636 $11,380
224,029
kWh
$14,669
-
kW-mo/yr
$2,161
-
MMBtu
$(-212.0)
TOTAL IMPLEMENTED $6,365 $8,636 $3,860
75,996
kWh
$2,717
-
kW-mo/yr
- $(-212.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs