Assessment Year | 2012 |
---|---|
Principal Product | conveyor pullies |
NAICS | 333922: Conveyor and Conveying Equipment Manufacturing |
SIC | 3535: Conveyors and Conveying Equipment |
Sales Range | $100 M to 500M |
# of Employees | 346 |
Plant Area |
276,000
ft2
|
Annual Production | 365,000
pieces
|
Production Hrs. Annual | 4,743
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $307,402 | 4,074,000 |
kWh
|
$0.075 |
Electricity Demand | $1 | 12,188 |
kW-mo/yr
|
$0.000 |
Electricity Fees | $23,257 | - |
|
- |
Natural Gas | $109,924 | 12,780 |
MMBtu
|
$8.60 |
Other Gas | $4,338 | 1 |
MMBtu
|
$4,338.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,646 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,545 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,153 | $960 |
$10,153
134,564
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,463 | $2,000 |
$7,463
98,916
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $2,286 | $1,843 |
$2,286
30,292
kWh
|
- | - | |
04 | 2.7261: Install timers and/or thermostats | $10,082 | $1,700 |
$8,605
114,054
kWh
|
$1,419
-
MMBtu
|
$58
-
MMBtu
|
|
05 | 2.4133: Use most efficient type of electric motors | $5,599 | $3,290 |
$5,599
74,203
kWh
|
- | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,878 | $1,875 |
$2,878
38,138
kWh
|
- | - | |
07 | 2.7135: Install occupancy sensors | $2,185 | $217 |
$2,185
28,962
kWh
|
- | - | |
TOTAL RECOMMENDED | $40,646 | $11,885 |
$39,169
519,129
kWh
|
$1,419
-
MMBtu
|
$58
-
MMBtu
|
||
TOTAL IMPLEMENTED | $17,545 | $3,700 |
$16,068
212,970
kWh
|
$1,419
-
MMBtu
|
$58
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs