Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

210

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Lawn and garden tractors and home lawn and garden equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0266 #06 Y:2018 Turn off equipment when not in use $12,385 $4,900
MZ0266 #05 Y:2018 Use synthetic lubricant $221 -
MZ0266 #04 Y:2018 Use waste heat from hot flue gases to preheat $1,435 $5,500
MZ0266 #03 Y:2018 Utilize energy-efficient belts and other improved mechanisms $343 -
MZ0266 #02 Y:2018 Utilize higher efficiency lamps and/or ballasts $10,437 $17,755
MZ0266 #01 Y:2018 Install compressor air intakes in coolest locations $630 $1,240
MZ0205 #05 Y:2015 Install occupancy sensors $969 $400
MZ0205 #04 Y:2015 Lower temperature during the winter season and vice-versa $397 -
MZ0205 #03 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $1,581 $850
MZ0205 #02 Y:2015 Remove or close off unneeded compressed air lines $1,559 -
MZ0205 #01 Y:2015 Insulate bare equipment $771 $1,050
UA0099 #06 Y:2013 Reduce the pressure of compressed air to the minimum required $5,883 $400
UA0099 #05 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $12,301 $5,000
UA0099 #04 Y:2013 Optimize plant power factor $19,434 $14,980
UA0099 #03 Y:2013 Use radiant heater for spot heating $25,020 $52,360
UA0099 #02 Y:2013 Disconnect ballasts $3,632 $242
UA0099 #01 Y:2013 Utilize higher efficiency lamps and/or ballasts $109,678 $164,833
WV0454 #11 Y:2012 Reduce the pressure of compressed air to the minimum required $424 $50
WV0454 #10 Y:2012 Establish a predictive maintenance program $531 $1,000
WV0454 #09 Y:2012 Eliminate or reduce compressed air usage $1,183 $2,711