ITAC Assessment: MZ0205
ITAC logo
ITAC Assessment: MZ0205
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Plastic garden tools, plastic house hold items
NAICS 332216: Saw Blade and Handtool Manufacturing
SIC 3524: Lawn and Garden Tractors and Home Lawn and Garden Equipment
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 41,000
ft2
Annual Production 120,000,000
pieces
Production Hrs. Annual 5,100
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,250 1,438,779
kWh
Electricity Demand $14,468 5,192
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,277 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,506

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2511: Insulate bare equipment $771 $1,050 $771
10,060
kWh
-
02 2.4235: Remove or close off unneeded compressed air lines $1,559 - $1,436
18,743
kWh
$123
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,581 $850 $1,456
18,999
kWh
$125
-
kW-mo/yr
04 2.7221: Lower temperature during the winter season and vice-versa $397 - $364
4,746
kWh
$33
-
kW-mo/yr
05 2.7135: Install occupancy sensors $969 $400 $969
12,643
kWh
-
TOTAL RECOMMENDED $5,277 $2,300 $4,996
65,191
kWh
$281
-
kW-mo/yr
TOTAL IMPLEMENTED $4,506 $1,250 $4,225
55,131
kWh
$281
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs