Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

68

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Farm machinery and equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0216 #03 Y:2002 Install occupancy sensors $1,635 $6,230
BD0216 #02 Y:2002 Recover waste heat from equipment $5,756 $1,500
BD0216 #01 Y:2002 Use radiant heater for spot heating $44,159 $52,000
BD0100 #09 Y:1997 Replace existing equipment with more suitable substitutes $260,375 $900,000
BD0100 #08 Y:1997 Contract a wood pallet recycling company $832 $420
BD0100 #07 Y:1997 Convert to high volume low pressure (hvlp) paint guns $1,996 $750
BD0100 #06 Y:1997 Change procedures / equipment / operating conditions $9,880 $30,000
BD0100 #05 Y:1997 Insulate bare equipment $200 $369
BD0100 #04 Y:1997 Utilize higher efficiency lamps and/or ballasts $335 $698
BD0100 #03 Y:1997 Install partitions to reduce size of conditioned space $981 $1,500
BD0100 #02 Y:1997 Install occupancy sensors $1,212 $200
BD0100 #01 Y:1997 Use most efficient type of electric motors $5,782 $10,300
BD0090 #10 Y:1997 Clear and rent existing space $12,408 $480
BD0090 #09 Y:1997 Use a rag recycle service $3,953 -
BD0090 #08 Y:1997 Convert to high volume low pressure (hvlp) paint guns $31,686 $29,850
BD0090 #07 Y:1997 Utilize higher efficiency lamps and/or ballasts $1,069 $2,035
BD0090 #06 Y:1997 Reduce the pressure of compressed air to the minimum required $1,289 -
BD0090 #05 Y:1997 Install occupancy sensors $3,769 $2,250
BD0090 #04 Y:1997 Recover waste heat from equipment $4,231 $950
BD0090 #03 Y:1997 Use most efficient type of electric motors $6,924 $13,880