Assessment Year | 2002 |
---|---|
Principal Product | Lawn and Home Products |
NAICS |
n/a
|
SIC | 3523: Farm Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 185 |
Plant Area |
500,000
ft2
|
Annual Production | 2,500,000
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $221,065 | 3,768,048 |
kWh
|
$0.059 |
Natural Gas | $342,817 | 46,026 |
MMBtu
|
$7.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $96,291 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,295 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $44,159 | $52,000 | - |
$44,159
-
MMBtu
|
- | - | - | - | - | |
02 | 2.2437: Recover waste heat from equipment | $5,756 | $1,500 | - |
$5,756
-
MMBtu
|
- | - | - | - | - | |
03 | 2.7135: Install occupancy sensors | $1,635 | $6,230 |
$1,316
22,479
kWh
|
- | - | - | - | $319 | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,518 | $1,800 |
$1,518
25,909
kWh
|
- | - | - | - | - | - | |
05 | 2.1123: Install automatic stack damper | $1,359 | $1,500 | - |
$1,359
-
MMBtu
|
- | - | - | - | - | |
06 | 2.7135: Install occupancy sensors | $937 | $975 |
$937
16,002
kWh
|
- | - | - | - | - | - | |
07 | 2.1222: Install turbulators | $813 | $1,700 | - |
$813
-
MMBtu
|
- | - | - | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $399 | $328 |
$234
2,984
kWh
|
- | - | $69 | $96 | - | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $387 | - |
$387
6,724
kWh
|
- | - | - | - | - | - | |
10 | 2.4133: Use most efficient type of electric motors | $221 | $800 |
$221
3,810
kWh
|
- | - | - | - | - | - | |
11 | 2.2135: Repair and eliminate steam leaks | $208 | $300 | - |
$208
-
MMBtu
|
- | - | - | - | - | |
12 | 3.4114: Replace city water with recycled water via cooling tower | $4,719 | $12,000 |
$(-246.0)
(-4,191)
kWh
|
- |
$5,465
-
Tgal
|
- | - | $(-500.0) | - | |
13 | 4.441: Install automatic packing equipment | $25,880 | $25,000 | - | - | - | $25,880 | - | - | - | |
14 | 4.652: Replace existing equipment with more suitable substitutes | $8,000 | $1,000 | - | - | - | - | - | - | $8,000 | |
15 | 3.5316: Contract a wood pallet recycling company | $300 | $120 | - | - | - | - | - | $300 | - | |
TOTAL RECOMMENDED | $96,291 | $105,253 |
$4,367
73,717
kWh
|
$52,295
-
MMBtu
|
$5,465
-
Tgal
|
$25,949 | $96 | $119 | $8,000 | ||
TOTAL IMPLEMENTED | $8,295 | $5,300 |
$1,518
25,909
kWh
|
$6,777
-
MMBtu
|
- | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs