ITAC Assessment: BD0090
ITAC logo
ITAC Assessment: BD0090
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Harvesters
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area 350,000
ft2
Annual Production 12
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,220 4,148,300
kWh
Electricity Demand $152,574 12,250
kW-mo/yr
Electricity Fees $331 -
Natural Gas $131,447 26,928
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $106,722 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $98,509

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $33,305 $30,062 - - $33,305
-
MMBtu
- - - -
02 2.7491: Insulate glazing, walls, ceilings, and roofs $8,088 $17,646 - - $8,088
-
MMBtu
- - - -
03 2.4133: Use most efficient type of electric motors $6,924 $13,880 $2,732
83,236
kWh
$4,192
-
kW-mo/yr
- - - - -
04 2.2437: Recover waste heat from equipment $4,231 $950 - - $4,231
-
MMBtu
- - - -
05 2.7135: Install occupancy sensors $3,769 $2,250 $2,834
86,460
kWh
$935
-
kW-mo/yr
- - - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,289 - $1,289
39,273
kWh
- - - - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,069 $2,035 $461
14,068
kWh
$608
-
kW-mo/yr
- - - - -
08 3.2123: Convert to high volume low pressure (hvlp) paint guns $31,686 $29,850 - - - - - $26,273 $5,413
09 3.7131: Use a rag recycle service $3,953 - - - - $3,953
-
lb
- - -
10 4.521: Clear and rent existing space $12,408 $480 - - - - $12,408 - -
TOTAL RECOMMENDED $106,722 $97,153 $7,316
223,037
kWh
$5,735
-
kW-mo/yr
$45,624
-
MMBtu
$3,953
-
lb
$12,408 $26,273 $5,413
TOTAL IMPLEMENTED $98,509 $83,273 $3,295
100,528
kWh
$1,543
-
kW-mo/yr
$45,624
-
MMBtu
$3,953
-
lb
$12,408 $26,273 $5,413
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs