424
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Fluid power valves and hose fittings | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| BD0209 #01 Y:2002 | 01 | 2002 | Install occupancy sensors | $3,063 | $1,050 | |
| BD0207 #08 Y:2002 | 08 | 2002 | Install compressor air intakes in coolest locations | $298 | $400 | |
| BD0207 #07 Y:2002 | 07 | 2002 | Utilize higher efficiency lamps and/or ballasts | $311 | $280 | |
| BD0207 #06 Y:2002 | 06 | 2002 | Install storm windows and doors | $374 | $1,000 | |
| BD0207 #05 Y:2002 | 05 | 2002 | Install automatic stack damper | $608 | $2,000 | |
| BD0207 #04 Y:2002 | 04 | 2002 | Reduce the pressure of compressed air to the minimum required | $769 | - | |
| BD0207 #03 Y:2002 | 03 | 2002 | Use radiant heater for spot heating | $1,288 | $4,000 | |
| BD0207 #02 Y:2002 | 02 | 2002 | Install occupancy sensors | $2,151 | $825 | |
| BD0207 #01 Y:2002 | 01 | 2002 | Utilize higher efficiency lamps and/or ballasts | $2,416 | $9,030 | |
| WV0219 #14 Y:2001 | 14 | 2001 | Train operators for maximum operating efficiency | $50,000 | $26,800 | |
| WV0219 #13 Y:2001 | 13 | 2001 | Meter waste water | $2,332 | $800 | |
| WV0219 #12 Y:2001 | 12 | 2001 | Burn waste oil for heat | $1,298 | $4,470 | |
| WV0219 #11 Y:2001 | 11 | 2001 | Replace existing hvac unit with high efficiency model | $1,137 | $4,400 | |
| WV0219 #10 Y:2001 | 10 | 2001 | Install outside air damper / economizer on hvac unit | $1,137 | $4,500 | |
| WV0219 #09 Y:2001 | 09 | 2001 | Insulate bare equipment | $1,097 | $64 | |
| WV0219 #08 Y:2001 | 08 | 2001 | Reduce the pressure of compressed air to the minimum required | $1,318 | $40 | |
| WV0219 #07 Y:2001 | 07 | 2001 | Use photocell controls | $548 | $300 | |
| WV0219 #06 Y:2001 | 06 | 2001 | Reduce illumination to minimum necessary levels | $7,137 | $21,787 | |
| WV0219 #05 Y:2001 | 05 | 2001 | Install compressor air intakes in coolest locations | $209 | $100 | |
| WV0219 #04 Y:2001 | 04 | 2001 | Establish a predictive maintenance program | $7,765 | $600 |