Assessment Year | 2002 |
---|---|
Principal Product | High Pressure Hydraulic Hose Assemblies |
NAICS |
n/a
|
SIC | 3492: Fluid Power Valves and Hose Fittings |
Sales Range | $10 M to 50M |
# of Employees | 48 |
Plant Area |
60,000
ft2
|
Annual Production | 1,675,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $43,328 | 906,244 |
kWh
|
$0.048 |
Electricity Demand | $14,710 | 1,773 |
kW-mo/yr
|
$8.30 |
Natural Gas | $4,150 | 1,040 |
MMBtu
|
$3.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $173,722 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $704 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $3,063 | $1,050 |
$2,764
48,154
kWh
|
$299
-
kW-mo/yr
|
- | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $1,724 | $2,550 |
$1,581
27,547
kWh
|
$143
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $977 | $600 |
$872
15,212
kWh
|
$105
-
kW-mo/yr
|
- | - | - | |
04 | 2.7231: Use radiant heater for spot heating | $704 | $2,700 | - | - |
$704
-
MMBtu
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $676 | - |
$603
10,515
kWh
|
$73
-
kW-mo/yr
|
- | - | - | |
06 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $540 | $750 | - | - | - | - | $540 | |
07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $210 | $300 | - | - | - | - | $210 | |
08 | 4.513: Re-arrange equipment layout to reduce labor costs | $165,828 | $350,000 | - | - | - | $165,828 | - | |
TOTAL RECOMMENDED | $173,722 | $357,950 |
$5,820
101,428
kWh
|
$620
-
kW-mo/yr
|
$704
-
MMBtu
|
$165,828 | $750 | ||
TOTAL IMPLEMENTED | $704 | $2,700 | - | - |
$704
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs