ITAC Assessment: GT0221
ITAC logo
ITAC Assessment: GT0221
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product CARPET YARN
NAICS
n/a
SIC 2284: Thread Mills
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area
n/a
Annual Production 25,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,286,223 29,184,057
kWh
Natural Gas $313,398 74,318
MMBtu
Fuel Oil #6 $27,331 5,212
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,980 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,677

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $6,817 $500 - $6,270
-
MMBtu
$547
-
MMBtu
02 2.1243: Use heat from boiler blowdown to preheat boiler feed water $4,716 $5,000 - $4,339
-
MMBtu
$377
-
MMBtu
03 2.2121: Increase amount of condensate returned $18,719 $15,000 - $17,205
-
MMBtu
$1,514
-
MMBtu
04 2.2121: Increase amount of condensate returned $2,089 $2,000 - $1,919
-
MMBtu
$170
-
MMBtu
05 2.2223: Enhance sensitivity of temperature control and cutoff $11,160 $10,000 $11,160
489,449
kWh
- -
06 2.3191: Use demand controller or load shedder $23,900 $12,000 $23,900
-
kWh
- -
07 2.4133: Use most efficient type of electric motors $6,879 $7,166 $6,879
158,558
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,700 $3,780 $2,700
61,547
kWh
- -
TOTAL RECOMMENDED $76,980 $55,446 $44,639
709,554
kWh
$29,733
-
MMBtu
$2,608
-
MMBtu
TOTAL IMPLEMENTED $20,677 $14,280 $13,860
550,996
kWh
$6,270
-
MMBtu
$547
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs