Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

64

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Small arms
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1063 #04 Y:2021 Utilize higher efficiency lamps and/or ballasts $1,908 $6,335
OK1063 #03 Y:2021 Replace existing hvac unit with high efficiency model $1,123 $2,600
OK1063 #02 Y:2021 Eliminate or reduce compressed air usage $1,446 -
OK1063 #01 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $1,892 $617
OK0984 #05 Y:2017 Utilize higher efficiency lamps and/or ballasts $10,456 $10,800
OK0984 #04 Y:2017 Utilize higher efficiency lamps and/or ballasts $2,118 $6,150
OK0984 #03 Y:2017 Install set-back timers $1,202 $740
OK0984 #02 Y:2017 Train operators for maximum operating efficiency $22,864 $1,500
OK0984 #01 Y:2017 Maintain air filters by cleaning or replacement $2,990 $1,320
MA0780 #03 Y:2017 Use optimum thickness insulation $575 $865
MA0780 #02 Y:2017 Reduce the pressure of compressed air to the minimum required $583 $100
MA0780 #01 Y:2017 Use solar heat for heat $66,074 $629,413
AS0441 #03 Y:2017 Use solar heat to heat water $1,380 $1,005
AS0441 #02 Y:2017 Use or replace with energy efficient substitutes $10,783 $37,000
AS0441 #01 Y:2017 Upgrade controls on compressors $174,581 $25,494
MA0634 #06 Y:2008 Install / repair insulation on steam lines $498 $500
MA0634 #05 Y:2008 Reduce air conditioning load by evaporating water from roof $1,034 $6,000
MA0634 #04 Y:2008 Replace existing hvac unit with high efficiency model $1,932 $2,500
MA0634 #03 Y:2008 Reduce combustion air flow to optimum $2,058 $3,000
MA0634 #02 Y:2008 Use waste heat from hot flue gases to preheat incoming fluids $11,407 $20,000