ITAC Assessment: MA0780
ITAC logo
ITAC Assessment: MA0780
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product metal stampings
NAICS 332994: Small Arms, Ordnance, and Ordnance Accessories Manufacturing
SIC 3484: Small Arms
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 27,500
ft2
Annual Production 14,600
units
Production Hrs. Annual 7,904
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,236 1,320,300
kWh
Electricity Demand $34,800 3,071
kW-mo/yr
Electricity Fees $21,996 -
LPG $1,988 81
MMBtu
TOTAL YEARLY COSTS $183,020
RECOMMENDED SAVINGS* $67,232 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.9113: Use solar heat for heat $66,074 $629,413 $66,074
702,914
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $583 $100 $583
6,200
kWh
03 2.2515: Use optimum thickness insulation $575 $865 $575
6,120
kWh
TOTAL RECOMMENDED $67,232 $630,378 $67,232
715,234
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs