ITAC Assessment: TN0578
ITAC logo
ITAC Assessment: TN0578
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Hydraulic pumps
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 98
Plant Area 73,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 6,732
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $172,533 4,730,950
kWh
Electricity Demand $56,524 12,182
kW-mo/yr
Natural Gas $8,063 1,488
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,647 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,959

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 3.2121: Convert to electrostatic powder coating $10,682 $26,600 $(-500.0)
(-13,775)
kWh
- - $2,000
-
lb
$5,606 - $3,576
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,333 $21,300 $7,607
211,313
kWh
$1,726
-
kW-mo/yr
- - - - -
03 2.6218: Turn off equipment when not in use $4,500 - $4,500
124,267
kWh
- - - - - -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $4,126 $8,500 - - - - - $4,126 -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,359 $2,300 $802
22,274
kWh
$557
-
kW-mo/yr
- - - - -
06 3.4115: Recover and reuse cooling water $1,311 $2,530 $(-100.0)
(-2,638)
kWh
- $862
-
gal
- - - $549
07 2.4314: Use synthetic lubricant $336 - $169
4,689
kWh
$167
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $31,647 $61,230 $12,478
346,130
kWh
$2,450
-
kW-mo/yr
$862
-
gal
$2,000
-
lb
$5,606 $4,126 $4,125
TOTAL IMPLEMENTED $17,959 $29,800 $12,107
335,580
kWh
$1,726
-
kW-mo/yr
- - - $4,126 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs