ITAC Assessment: MZ0028
ITAC logo
ITAC Assessment: MZ0028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product bed springs
NAICS 423840: Industrial Supplies Merchant Wholesalers
SIC 2515: Mattresses, Foundations, and Convertible Beds
Sales Range $50
M
to 100
M
# of Employees 520
Plant Area 800,000
ft2
Annual Production 3,630,000
pieces
Production Hrs. Annual 5,808
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $726,118 18,860,213
kWh
Natural Gas $168,630 20,440
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,667 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,837

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $723 $500 $723
14,793
kWh
-
02 2.2437: Recover waste heat from equipment $30,107 $6,000 - $30,107
-
MMBtu
03 2.2515: Use optimum thickness insulation $457 $500 - $457
-
MMBtu
04 2.6127: Maintain air filters by cleaning or replacement $11,380 $7,000 $11,380
295,560
kWh
-
TOTAL RECOMMENDED $42,667 $14,000 $12,103
310,353
kWh
$30,564
-
MMBtu
TOTAL IMPLEMENTED $11,837 $7,500 $11,380
295,560
kWh
$457
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs