Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

364

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Ordnance and accessories, except vehicles and guided missiles
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CI0015 #08 Y:2023 Use most efficient type of electric motors $1,262 $1,310
CI0015 #07 Y:2023 Recover waste heat from equipment $1,292 $5,000
CI0015 #06 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,444 $2,700
CI0015 #05 Y:2023 Replace fossil fuel equipment with electrical equipment $1,958 $3,500
CI0015 #04 Y:2023 Replace boiler $3,770 $9,000
CI0015 #03 Y:2023 Reduce the pressure of compressed air to the minimum required $11,757 -
CI0015 #02 Y:2023 Replace existing hvac unit with high efficiency model $36,511 $165,000
CI0015 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $88,567 $1,500
OK1063 #04 Y:2021 Utilize higher efficiency lamps and/or ballasts $1,908 $6,335
OK1063 #03 Y:2021 Replace existing hvac unit with high efficiency model $1,123 $2,600
OK1063 #02 Y:2021 Eliminate or reduce compressed air usage $1,446 -
OK1063 #01 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $1,892 $617
UU0184 #06 Y:2021 Reduce the pressure of compressed air to the minimum required $546 $550
UU0184 #05 Y:2021 Lower temperature during the winter season and vice-versa $731 $2,000
UU0184 #04 Y:2021 Turn off equipment when not in use $1,530 $500
UU0184 #03 Y:2021 Optimize plant power factor $2,375 $6,744
UU0184 #02 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $2,459 $2,700
UU0184 #01 Y:2021 Utilize other methods to remove contaminants $26,453 $92,586
OK0980 #06 Y:2017 Optimize plant power factor $13,258 $16,892
OK0980 #05 Y:2017 Use waste heat from hot flue gases to preheat $24,343 $31,350