ITAC Assessment: CI0015
ITAC logo
ITAC Assessment: CI0015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Combustible Ordnance
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 3489: Ordnance and Accessories, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 219
Plant Area 89,743
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 1,960
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,217,040 8,743,200
kWh
Electricity Demand $165,726 24,552
kW-mo/yr
Natural Gas $194,621 48,505
MMBtu
Waste Disposal Costs
Water Usage $22,582 7,032
Tgal
Water Disposal $32,971 7,032
Tgal
TOTAL YEARLY COSTS $1,632,940
RECOMMENDED SAVINGS* $146,561 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,511

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $88,567 $1,500 $87,485
628,495
kWh
$1,082
-
kW-mo/yr
-
02 2.7232: Replace existing hvac unit with high efficiency model $36,511 $165,000 $36,511
262,296
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $11,757 - $11,292
81,120
kWh
$465
-
kW-mo/yr
-
04 2.1224: Replace boiler $3,770 $9,000 $(-3,056.0)
(-21,952)
kWh
$(-182.0)
-
kW-mo/yr
$7,008
-
MMBtu
05 2.1321: Replace fossil fuel equipment with electrical equipment $1,958 $3,500 $1,958
14,067
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,444 $2,700 $1,113
7,997
kWh
$331
-
kW-mo/yr
-
07 2.2437: Recover waste heat from equipment $1,292 $5,000 - - $1,292
-
MMBtu
08 2.4133: Use most efficient type of electric motors $1,262 $1,310 $1,050
7,543
kWh
$212
-
kW-mo/yr
-
TOTAL RECOMMENDED $146,561 $188,010 $136,353
979,566
kWh
$1,908
-
kW-mo/yr
$8,300
-
MMBtu
TOTAL IMPLEMENTED $36,511 $165,000 $36,511
262,296
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs