ITAC Assessment: CO0655
ITAC logo
ITAC Assessment: CO0655
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Plastic injection molded parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 44,800
ft2
Annual Production 585,000
pieces
Production Hrs. Annual 6,266
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,611 1,305,036
kWh
Electricity Demand $63,772 3,442
kW-mo/yr
Electricity Fees $844 -
Natural Gas $4,137 499
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,710 $67,190 $5,910
127,700
kWh
$4,800
-
kW-mo/yr
- - - -
02 2.2511: Insulate bare equipment $590 $1,930 $570
12,200
kWh
$320
-
kW-mo/yr
$(-300.0)
-
MMBtu
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,640 $21,170 $2,270
44,600
kWh
$1,400
-
kW-mo/yr
- $130 - $(-160.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,070 $6,090 $970
14,100
kWh
- - $50 - $50
05 2.7142: Utilize higher efficiency lamps and/or ballasts $990 $2,070 $510
8,700
kWh
$420
-
kW-mo/yr
- - $20 $40
TOTAL RECOMMENDED $17,000 $98,450 $10,230
207,300
kWh
$6,940
-
kW-mo/yr
$(-300.0)
-
MMBtu
$180 $20 $(-70.0)
TOTAL IMPLEMENTED - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs