Assessment Year | 2012 |
---|---|
Principal Product | Plastic injection molded parts |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 70 |
Plant Area |
44,800
ft2
|
Annual Production | 585,000
pieces
|
Production Hrs. Annual | 6,266
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $63,611 | 1,305,036 |
kWh
|
$0.049 |
Electricity Demand | $63,772 | 3,442 |
kW-mo/yr
|
$18.53 |
Electricity Fees | $844 | - |
|
- |
Natural Gas | $4,137 | 499 |
MMBtu
|
$8.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,000 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,710 | $67,190 |
$5,910
127,700
kWh
|
$4,800
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.2511: Insulate bare equipment | $590 | $1,930 |
$570
12,200
kWh
|
$320
-
kW-mo/yr
|
$(-300.0)
-
MMBtu
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,640 | $21,170 |
$2,270
44,600
kWh
|
$1,400
-
kW-mo/yr
|
- | $130 | - | $(-160.0) | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,070 | $6,090 |
$970
14,100
kWh
|
- | - | $50 | - | $50 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $990 | $2,070 |
$510
8,700
kWh
|
$420
-
kW-mo/yr
|
- | - | $20 | $40 | |
TOTAL RECOMMENDED | $17,000 | $98,450 |
$10,230
207,300
kWh
|
$6,940
-
kW-mo/yr
|
$(-300.0)
-
MMBtu
|
$180 | $20 | $(-70.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs