| Assessment Year | 2012 |
|---|---|
| Principal Product | Plastic injection molded parts |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 70 |
| Plant Area |
44,800
ft2
|
| Annual Production | 585,000
pieces
|
| Production Hrs. Annual | 6,266
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $63,611 | 1,305,036 |
kWh
|
$0.049 |
| Electricity Demand | $63,772 | 3,442 |
kW-mo/yr
|
$18.53 |
| Electricity Fees | $844 | - |
|
- |
| Natural Gas | $4,137 | 499 |
MMBtu
|
$8.29 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $17,000 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,710 | $67,190 |
$5,910
127,700
kWh
|
$4,800
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.2511: Insulate bare equipment | $590 | $1,930 |
$570
12,200
kWh
|
$320
-
kW-mo/yr
|
$(-300.0)
-
MMBtu
|
- | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,640 | $21,170 |
$2,270
44,600
kWh
|
$1,400
-
kW-mo/yr
|
- | $130 | - | $(-160.0) | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,070 | $6,090 |
$970
14,100
kWh
|
- | - | $50 | - | $50 | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $990 | $2,070 |
$510
8,700
kWh
|
$420
-
kW-mo/yr
|
- | - | $20 | $40 | |
| TOTAL RECOMMENDED | $17,000 | $98,450 |
$10,230
207,300
kWh
|
$6,940
-
kW-mo/yr
|
$(-300.0)
-
MMBtu
|
$180 | $20 | $(-70.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs