1,564
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Electroplating, plating, polishing, anodizing, and coloring | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UC2510 #06 Y:2025 | 06 | 2025 | Use / purchase optimum sized compressor | $8,976 | $24,000 |
n/a
|
UC2510 #05 Y:2025 | 05 | 2025 | Utilize controls to operate equipment only when needed | $7,585 | $50 |
n/a
|
UC2510 #04 Y:2025 | 04 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $273 | $113 |
n/a
|
UC2510 #03 Y:2025 | 03 | 2025 | Install compressor air intakes in coolest locations | $4,144 | $1,950 |
n/a
|
UC2510 #02 Y:2025 | 02 | 2025 | Use solar heat to make electricty | $26,200 | $343,027 |
n/a
|
UC2510 #01 Y:2025 | 01 | 2025 | Pay utility bills on time | $984 | - |
n/a
|
TT0336 #12 Y:2025 | 12 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $153 | $255 |
n/a
|
TT0336 #11 Y:2025 | 11 | 2025 | Install occupancy sensors | $355 | $1,600 |
n/a
|
TT0336 #10 Y:2025 | 10 | 2025 | Utilize controls to operate equipment only when needed | $507 | $100 |
n/a
|
TT0336 #09 Y:2025 | 09 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $551 | $375 |
n/a
|
TT0336 #08 Y:2025 | 08 | 2025 | Reduce the pressure of compressed air to the minimum required | $572 | $60 |
n/a
|
TT0336 #07 Y:2025 | 07 | 2025 | Eliminate or reduce compressed air usage | $1,078 | $400 |
n/a
|
TT0336 #06 Y:2025 | 06 | 2025 | Utilize controls to operate equipment only when needed | $1,830 | $500 |
n/a
|
TT0336 #05 Y:2025 | 05 | 2025 | Optimize plant power factor | $2,201 | $5,250 |
n/a
|
TT0336 #04 Y:2025 | 04 | 2025 | Burn a less expensive grade of fuel | $6,724 | $40,000 |
n/a
|
TT0336 #03 Y:2025 | 03 | 2025 | Reschedule plant operations or reduce load to avoid peaks | $13,640 | $6,680 |
n/a
|
TT0336 #02 Y:2025 | 02 | 2025 | Use battery storage for demand control | $19,703 | $159,000 |
n/a
|
TT0336 #01 Y:2025 | 01 | 2025 | Minimize non-essential material in heat treatment process | $21,145 | $30,000 |
n/a
|
IP0213 #10 Y:2025 | 10 | 2025 | Utilize higher efficiency lamps and/or ballasts | $7,498 | $13,433 |
n/a
|
IP0213 #09 Y:2025 | 09 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $23,151 | $26,250 |
n/a
|