ITAC Assessment: UC2510
ITAC logo
ITAC Assessment: UC2510
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Precision plating
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 113
Plant Area 92,856
ft2
Annual Production 81,550,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $612,568 8,140,347
kWh
Electricity Demand $112,369 13,972
kW-mo/yr
Electricity Fees $4,635 -
Natural Gas $288,043 59,951
MMBtu
TOTAL YEARLY COSTS $1,017,615
RECOMMENDED SAVINGS* $48,163 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
01 2.8123: Pay utility bills on time $984 - - - $984 -
02 2.9114: Use solar heat to make electricty $26,200 $343,027 $32,272
403,397
kWh
- - $(-6,072.0)
03 2.4221: Install compressor air intakes in coolest locations $4,144 $1,950 $3,642
45,531
kWh
$501
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $273 $113 $240
3,004
kWh
$33
-
kW-mo/yr
- -
05 2.6231: Utilize controls to operate equipment only when needed $7,585 $50 $7,585
94,813
kWh
- - -
06 2.4226: Use / purchase optimum sized compressor $8,976 $24,000 $7,827
97,843
kWh
$1,149
-
kW-mo/yr
- -
TOTAL RECOMMENDED $48,163 $369,141 $51,567
644,588
kWh
$1,683
-
kW-mo/yr
$984 $(-6,072.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs