Assessment Year | 2025 |
---|---|
Principal Product | Metal Plating |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $5 M to 10M |
# of Employees | 45 |
Plant Area |
33,149
ft2
|
Annual Production | 4,740,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $321,832 | 2,420,480 |
kWh
|
$0.13 | |
Natural Gas | $175,610 | 20,736 |
MMBtu
|
$8.47 | |
Waste Disposal Costs | |||||
Water Usage | $22,689 | 7,559 |
Tgal
|
$3.00 | |
Water Disposal | $91,247 | 7,559 |
Tgal
|
$12.07 | |
TOTAL YEARLY COSTS | $611,378 | ||||
RECOMMENDED SAVINGS* | $158,635 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $1,494 | - |
$1,494
11,232
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,623 | $640 |
$15,623
117,465
kWh
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $10,374 | $270 |
$10,374
78,000
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $40,943 | $4,528 |
$40,943
307,840
kWh
|
- | |
05 | 2.7135: Install occupancy sensors | $953 | $280 |
$953
7,169
kWh
|
- | |
06 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $9,346 | $3,710 |
$9,346
70,268
kWh
|
- | |
07 | 2.7224: Reduce space conditioning during non-working hours | $825 | $340 |
$495
3,720
kWh
|
$330
-
MMBtu
|
|
08 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $48,428 | $56,200 | - |
$48,428
-
MMBtu
|
|
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $23,151 | $26,250 |
$23,151
174,068
kWh
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,498 | $13,433 |
$7,498
56,374
kWh
|
- | |
TOTAL RECOMMENDED | $158,635 | $105,651 |
$109,877
826,136
kWh
|
$48,758
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs