Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

972

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Metal stampings, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0586 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $9,340 $49,500
LE0586 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $14,427 $35,960
LE0586 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $6,379 $2,500
LE0586 #02 Y:2024 Install timers and/or thermostats $17,326 $1,600
LE0586 #01 Y:2024 Install occupancy sensors $1,582 $70
IP0201 #08 Y:2024 Use or replace with energy efficient substitutes $10,830 $25,000
IP0201 #07 Y:2024 Install compressor air intakes in coolest locations $3,237 $2,101
IP0201 #06 Y:2024 Install occupancy sensors $2,678 $1,198
IP0201 #05 Y:2024 Recover waste heat from equipment $4,991 $1,471
IP0201 #04 Y:2024 Utilize controls to operate equipment only when needed $133,638 $39,257
IP0201 #03 Y:2024 Install sub-metering equipment $3,904 $700
IP0201 #02 Y:2024 Change procedures / equipment / operating conditions $9,654 -
IP0201 #01 Y:2024 Turn off equipment when not in use $55,084 -
NT0024 #06 Y:2024 Lower temperature during the winter season and vice-versa $351 $180
NT0024 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,083 $5,482
NT0024 #04 Y:2024 Apply for investment incentives $5,847 -
NT0024 #03 Y:2024 Optimize plant power factor $4,810 $1,986
NT0024 #02 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $6,929 $5,415
NT0024 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $4,921 $5,609
NT0002 #07 Y:2023 Clean or color roof to reduce solar load $3,880 $7,474