Assessment Year | 2025 |
---|---|
Principal Product | High Precision Metal Components |
NAICS | 336370: Motor Vehicle Metal Stamping |
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 95 |
Plant Area |
57,000
ft2
|
Annual Production | 20,000,000
pieces
|
Production Hrs. Annual | 5,148
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $217,308 | 2,103,715 |
kWh
|
$0.10 |
Electricity Demand | $310,679 | 8,274 |
kW-mo/yr
|
$37.55 |
Electricity Fees | $60,714 | - |
|
- |
LPG | $8,854 | 293 |
MMBtu
|
$30.20 |
TOTAL YEARLY COSTS | $597,555 | |||
RECOMMENDED SAVINGS* | $698,852 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Ancillary Material Cost Savings | By-product Production Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.212: Adopt in-house material generation | $216,823 | $1,200,000 |
$3,073
29,746
kWh
|
- | - | - | - | $213,750 | |
02 | 4.212: Adopt in-house material generation | $185,000 | $300,000 | - | - | - | $225,000 | $(-40,000.0) | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $89,970 | $5,500 |
$48,928
473,650
kWh
|
$41,042
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.3141: Use battery storage for demand control | $68,217 | $808,402 |
$6,079
58,852
kWh
|
$62,138
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $46,098 | $132,687 |
$46,098
446,251
kWh
|
- | - | - | - | - | |
06 | 2.3112: Store heated/ cooled water for use during peak demand periods | $44,384 | $135,900 | - |
$44,384
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.4226: Use / purchase optimum sized compressor | $32,345 | $75,000 |
$13,488
130,573
kWh
|
$18,857
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.2622: Replace existing chiller with high efficiency model | $5,584 | $70,000 |
$5,584
54,054
kWh
|
- | - | - | - | - | |
09 | 2.4239: Eliminate or reduce compressed air usage | $4,809 | $25 |
$4,809
46,550
kWh
|
- | - | - | - | - | |
10 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $4,676 | $10,000 |
$(-3,868.0)
(-37,440)
kWh
|
- |
$8,544
-
MMBtu
|
- | - | - | |
11 | 2.7134: Use photocell controls | $946 | $750 |
$196
1,904
kWh
|
$750
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $698,852 | $2,738,264 |
$124,387
1,204,140
kWh
|
$167,171
-
kW-mo/yr
|
$8,544
-
MMBtu
|
$225,000 | $(-40,000.0) | $213,750 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Ancillary Material Cost Savings | By-product Production Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs