ITAC Assessment: CI0047
ITAC logo
ITAC Assessment: CI0047
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product High Precision Metal Components
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 57,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 5,148
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $217,308 2,103,715
kWh
Electricity Demand $310,679 8,274
kW-mo/yr
Electricity Fees $60,714 -
LPG $8,854 293
MMBtu
TOTAL YEARLY COSTS $597,555
RECOMMENDED SAVINGS* $698,852 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Ancillary Material Cost Savings By-product Production Savings Increase in Production Savings
01 4.212: Adopt in-house material generation $216,823 $1,200,000 $3,073
29,746
kWh
- - - - $213,750
02 4.212: Adopt in-house material generation $185,000 $300,000 - - - $225,000 $(-40,000.0) -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $89,970 $5,500 $48,928
473,650
kWh
$41,042
-
kW-mo/yr
- - - -
04 2.3141: Use battery storage for demand control $68,217 $808,402 $6,079
58,852
kWh
$62,138
-
kW-mo/yr
- - - -
05 2.7491: Insulate glazing, walls, ceilings, and roofs $46,098 $132,687 $46,098
446,251
kWh
- - - - -
06 2.3112: Store heated/ cooled water for use during peak demand periods $44,384 $135,900 - $44,384
-
kW-mo/yr
- - - -
07 2.4226: Use / purchase optimum sized compressor $32,345 $75,000 $13,488
130,573
kWh
$18,857
-
kW-mo/yr
- - - -
08 2.2622: Replace existing chiller with high efficiency model $5,584 $70,000 $5,584
54,054
kWh
- - - - -
09 2.4239: Eliminate or reduce compressed air usage $4,809 $25 $4,809
46,550
kWh
- - - - -
10 2.8227: Adjust / maintain fork lift trucks for most efficient operation $4,676 $10,000 $(-3,868.0)
(-37,440)
kWh
- $8,544
-
MMBtu
- - -
11 2.7134: Use photocell controls $946 $750 $196
1,904
kWh
$750
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $698,852 $2,738,264 $124,387
1,204,140
kWh
$167,171
-
kW-mo/yr
$8,544
-
MMBtu
$225,000 $(-40,000.0) $213,750
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Ancillary Material Cost Savings By-product Production Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs