Assessment Year | 2025 |
---|---|
Principal Product | CNC Machining Services |
NAICS | 332710: Machine Shops |
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 55 |
Plant Area |
40,000
ft2
|
Annual Production | 60,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $87,606 | 1,610,400 |
kWh
|
$0.054 | |
Electricity Demand | $14,745 | 3,700 |
kW-mo/yr
|
$3.99 | |
Electricity Fees | $35,944 | - |
|
- | |
Natural Gas | $3,067 | 334 |
MMBtu
|
$9.18 | |
Waste Disposal Costs | |||||
Water Usage | $3,120 | 7,408 |
Tgal
|
$0.42 | |
TOTAL YEARLY COSTS | $144,482 | ||||
RECOMMENDED SAVINGS* | $24,929 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,948 | - |
$1,705
31,574
kWh
|
$243
-
kW-mo/yr
|
- | |
02 | 2.7261: Install timers and/or thermostats | $5,954 | $1,280 |
$5,311
98,349
kWh
|
- |
$643
-
MMBtu
|
|
03 | 2.2443: Re-use or recycle hot or cold process exhaust air | $3,049 | $2,500 | - | - |
$3,049
-
MMBtu
|
|
04 | 2.7135: Install occupancy sensors | $268 | $592 |
$268
4,962
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $79 | $185 |
$59
1,098
kWh
|
$20
-
kW-mo/yr
|
- | |
06 | 2.4226: Use / purchase optimum sized compressor | $6,157 | $20,008 |
$5,391
99,840
kWh
|
$766
-
kW-mo/yr
|
- | |
07 | 2.7232: Replace existing hvac unit with high efficiency model | $7,474 | $33,700 |
$6,804
126,000
kWh
|
$670
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $24,929 | $58,265 |
$19,538
361,823
kWh
|
$1,699
-
kW-mo/yr
|
$3,692
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||