ITAC Assessment: AS0367
ITAC logo
ITAC Assessment: AS0367
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Citrus Juices
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 40,000
ft2
Annual Production 2,000
Tgal
Production Hrs. Annual 7,344
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,629 1,790,400
kWh
Electricity Demand $11,142 4,385
kW-mo/yr
Electricity Fees $8,314 -
Natural Gas $24,396 4,214
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,349 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,811

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.2441: Preheat boiler makeup water with waste process heat $14,811 $5,240 - - $14,811
-
MMBtu
-
02 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $36,297 $90,000 $103,629
1,790,000
kWh
$11,142
-
kW-mo/yr
$(-78,474.0)
-
MMBtu
-
03 2.1221: Replace obsolete burners with more efficient ones $3,275 $4,395 - - $3,275
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,352 $9,037 $577
14,582
kWh
$352
-
kW-mo/yr
- $423
05 2.7145: Install skylights $708 $3,395 $708
17,885
kWh
- - -
06 2.7232: Replace existing hvac unit with high efficiency model $567 $1,500 $299
7,552
kWh
$268
-
kW-mo/yr
- -
07 2.4133: Use most efficient type of electric motors $339 $460 $279
7,045
kWh
$60
-
kW-mo/yr
- -
TOTAL RECOMMENDED $57,349 $114,027 $105,492
1,837,064
kWh
$11,822
-
kW-mo/yr
$(-60,388.0)
-
MMBtu
$423
TOTAL IMPLEMENTED $14,811 $5,240 - - $14,811
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs