34
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Iron and steel forgings | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UM0295 #10 Y:2005 | 10 | 2005 | Use photocell controls | $878 | $736 | |
| UM0295 #09 Y:2005 | 09 | 2005 | Insulate bare equipment | $1,316 | $1,860 | |
| UM0295 #08 Y:2005 | 08 | 2005 | Use waste heat from hot flue gases to preheat | $2,259 | $3,080 | |
| UM0295 #07 Y:2005 | 07 | 2005 | Utilize higher efficiency lamps and/or ballasts | $4,767 | $13,877 | |
| UM0295 #06 Y:2005 | 06 | 2005 | Install compressor air intakes in coolest locations | $7,040 | $1,200 | |
| UM0295 #05 Y:2005 | 05 | 2005 | Install vinyl strip / high speed / air curtain doors | $8,859 | $2,400 | |
| UM0295 #04 Y:2005 | 04 | 2005 | Improve air circulation with destratification fans / other methods | $10,656 | $5,250 | |
| UM0295 #03 Y:2005 | 03 | 2005 | Use flow control valves on equipment to optimize water use | $15,365 | $1,130 | |
| UM0295 #02 Y:2005 | 02 | 2005 | Optimize plant power factor | $71,400 | $75,000 | |
| UM0295 #01 Y:2005 | 01 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $80,138 | $170,000 | |
| UM0170 #05 Y:2000 | 05 | 2000 | Replace existing equipment with more suitable substitutes | $11,573 | $8,200 | |
| UM0170 #04 Y:2000 | 04 | 2000 | Recover waste heat from equipment | $64,245 | $22,000 | |
| UM0170 #03 Y:2000 | 03 | 2000 | Use waste heat from hot flue gases to generate steam | $185,532 | $310,000 | |
| UM0170 #02 Y:2000 | 02 | 2000 | Install compressor air intakes in coolest locations | $1,147 | $500 | |
| UM0170 #01 Y:2000 | 01 | 2000 | Install occupancy sensors | $709 | $1,660 | |
| UM0042 #06 Y:1995 | 06 | 1995 | Insulate bare equipment | $7,633 | $2,650 | n/a |
| UM0042 #05 Y:1995 | 05 | 1995 | Use waste heat from hot flue gases to preheat incoming fluids | $8,994 | $2,960 | n/a |
| UM0042 #04 Y:1995 | 04 | 1995 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,959 | $350 | n/a |
| UM0042 #03 Y:1995 | 03 | 1995 | Optimize plant power factor | $27,333 | $85,000 | n/a |
| UM0042 #02 Y:1995 | 02 | 1995 | Utilize higher efficiency lamps and/or ballasts | $2,676 | $21,703 | n/a |