| Assessment Year | 1995 |
|---|---|
| Principal Product | Steel Automotive parts |
| NAICS |
n/a
|
| SIC | 3462: Iron and Steel Forgings |
| Sales Range | $10 M to 50M |
| # of Employees | 230 |
| Plant Area |
300,000
ft2
|
| Annual Production | 1,700,000
pieces
|
| Production Hrs. Annual | 4,576
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,178,289 | 21,526,378 |
kWh
|
$0.055 |
| Natural Gas | $288,760 | 85,109 |
MMBtu
|
$3.39 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $51,910 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $2,315 | $12,150 | n/a |
$2,315
41,911
kWh
|
- |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,676 | $21,703 | n/a |
$2,676
48,652
kWh
|
- |
| 03 | 2.3212: Optimize plant power factor | $27,333 | $85,000 | n/a |
$27,333
-
kWh
|
- |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,959 | $350 | n/a |
$2,959
53,927
kWh
|
- |
| 05 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $8,994 | $2,960 | n/a | - |
$8,994
-
MMBtu
|
| 06 | 2.2511: Insulate bare equipment | $7,633 | $2,650 | n/a | - |
$7,633
-
MMBtu
|
| TOTAL RECOMMENDED | $51,910 | $124,813 |
$35,283
144,490
kWh
|
$16,627
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs