Assessment Year | 2000 |
---|---|
Principal Product | Pultrusion Products |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 188 |
Plant Area |
105,000
ft2
|
Annual Production | 24,000
thousand feet
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $147,844 | 4,489,742 |
kWh
|
$0.033 |
Electricity Demand | $177,303 | 9,738 |
kW-mo/yr
|
$18.21 |
Electricity Fees | $224 | - |
|
- |
Natural Gas | $19,298 | 3,160 |
MMBtu
|
$6.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $47,734 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,468 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $321 | $80 |
$321
9,379
kWh
|
- | - | - | - | |
02 | 2.7241: Install outside air damper / economizer on hvac unit | $2,521 | $3,970 |
$2,521
76,495
kWh
|
- | - | - | - | |
03 | 2.2511: Insulate bare equipment | $11,584 | $699 | - |
$11,584
-
MMBtu
|
- | - | - | |
04 | 2.2515: Use optimum thickness insulation | $264 | $298 | - |
$264
-
MMBtu
|
- | - | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $11,981 | $688 |
$11,981
184,056
kWh
|
- | - | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $745 | $432 |
$745
22,567
kWh
|
- | - | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $950 | $20 |
$950
28,722
kWh
|
- | - | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $328 | $401 |
$328
2,345
kWh
|
- | - | - | - | |
09 | 3.5316: Contract a wood pallet recycling company | $2,040 | $150 | - | - |
$2,040
-
lb
|
- | - | |
10 | 4.514: Re-arrange equipment layout to reduce handling costs | $2,000 | $658 | - | - | - | - | $2,000 | |
11 | 4.111: Add equipment/ operators to reduce production bottleneck | $15,000 | $275 | - | - | - | $15,000 | - | |
TOTAL RECOMMENDED | $47,734 | $7,671 |
$16,846
323,564
kWh
|
$11,848
-
MMBtu
|
$2,040
-
lb
|
$15,000 | $2,000 | ||
TOTAL IMPLEMENTED | $27,468 | $2,336 |
$13,580
224,502
kWh
|
$11,848
-
MMBtu
|
$2,040
-
lb
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs