ITAC Assessment: WV0196
ITAC logo
ITAC Assessment: WV0196
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Pultrusion Products
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 188
Plant Area 105,000
ft2
Annual Production 24,000
thousand feet
Production Hrs. Annual 6,864
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,844 4,489,742
kWh
Electricity Demand $177,303 9,738
kW-mo/yr
Electricity Fees $224 -
Natural Gas $19,298 3,160
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,734 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,468

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $321 $80 $321
9,379
kWh
- - - -
02 2.7241: Install outside air damper / economizer on hvac unit $2,521 $3,970 $2,521
76,495
kWh
- - - -
03 2.2511: Insulate bare equipment $11,584 $699 - $11,584
-
MMBtu
- - -
04 2.2515: Use optimum thickness insulation $264 $298 - $264
-
MMBtu
- - -
05 2.7111: Reduce illumination to minimum necessary levels $11,981 $688 $11,981
184,056
kWh
- - - -
06 2.4221: Install compressor air intakes in coolest locations $745 $432 $745
22,567
kWh
- - - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $950 $20 $950
28,722
kWh
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $328 $401 $328
2,345
kWh
- - - -
09 3.5316: Contract a wood pallet recycling company $2,040 $150 - - $2,040
-
lb
- -
10 4.514: Re-arrange equipment layout to reduce handling costs $2,000 $658 - - - - $2,000
11 4.111: Add equipment/ operators to reduce production bottleneck $15,000 $275 - - - $15,000 -
TOTAL RECOMMENDED $47,734 $7,671 $16,846
323,564
kWh
$11,848
-
MMBtu
$2,040
-
lb
$15,000 $2,000
TOTAL IMPLEMENTED $27,468 $2,336 $13,580
224,502
kWh
$11,848
-
MMBtu
$2,040
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs