Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,681

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Metal forgings and stampings
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0329 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $566 $600
TT0329 #07 Y:2025 Turn off equipment during breaks, reduce operating time $1,666 $2,490
TT0329 #06 Y:2025 Upgrade controls on compressors $1,983 $500
TT0329 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,210 $275
TT0329 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,292 $768
TT0329 #03 Y:2025 Turn off equipment when not in use $6,117 $120
TT0329 #02 Y:2025 Recover waste heat from equipment $6,292 $5,000
TT0329 #01 Y:2025 Use solar heat for heat $77,572 $478,110
WV0681 #08 Y:2025 Eliminate or reduce compressed air usage $308 $675
WV0681 #07 Y:2025 Establish a predictive maintenance program $1,642 $5,200
WV0681 #06 Y:2025 Insulate bare equipment $1,989 $4,797
WV0681 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,725 $848
WV0681 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $5,385 $5,940
WV0681 #03 Y:2025 Analyze flue gas for proper air/fuel ratio $9,352 $3,890
WV0681 #02 Y:2025 Develop a repair/replace policy $9,972 $8,140
WV0681 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $27,629 $34,630
TT0333 #08 Y:2025 Utilize energy-efficient belts and other improved mechanisms $596 $1,186
TT0333 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,569 $3,000
TT0333 #06 Y:2025 Replace high resistance ducts, pipes, and fittings $3,915 $1,640
TT0333 #05 Y:2025 Recover waste heat from equipment $3,400 $21,000