Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,639

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Metal forgings and stampings
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TR0061 #05 Y:2024 Reduce illumination to minimum necessary levels $1,297 $728
TR0061 #04 Y:2024 Replace existing hvac unit with high efficiency model $16,588 $55,200
TR0061 #03 Y:2024 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $2,219 $4,350
TR0061 #02 Y:2024 Cool compressor air intake with heat exchanger $9,288 $17,929
TR0061 #01 Y:2024 Use solar heat to make electricty $121,083 $551,388
TT0321 #13 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $584 $1,125
TT0321 #12 Y:2024 Minimize water usage $830 -
TT0321 #11 Y:2024 Apply for tax-free status for energy purchases $1,173 -
TT0321 #10 Y:2024 Turn off equipment when not in use $1,536 -
TT0321 #09 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,797 $3,000
TT0321 #08 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $3,076 $645
TT0321 #07 Y:2024 Utilize energy-efficient belts and other improved mechanisms $4,896 $1,450
TT0321 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $4,906 $3,825
TT0321 #05 Y:2024 Recover waste heat from equipment $10,097 $10,000
TT0321 #04 Y:2024 Meter recycled water (to reduce sewer charges) $11,473 $10,000
TT0321 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $19,594 $2,250
TT0321 #02 Y:2024 Optimize plant power factor $28,035 $28,125
TT0321 #01 Y:2024 Use solar heat for heat $71,296 $345,600
LE0586 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $9,340 $49,500
LE0586 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $14,427 $35,960