ITAC Assessment: TT0321
ITAC logo
ITAC Assessment: TT0321
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Aluminum door frames
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $100
M
to 500
M
# of Employees 297
Plant Area 220,000
ft2
Annual Production 9,120,000
pieces
Production Hrs. Annual 4,625
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $608,406 8,577,550
kWh
Electricity Demand $460,874 26,311
kW-mo/yr
Electricity Fees $(-115,336.0) -
Natural Gas $69,980 8,354
MMBtu
Waste Disposal Costs
Water Usage $22,434 2,738
Tgal
Water Disposal $20,316 2,738
Tgal
TOTAL YEARLY COSTS $1,066,674
RECOMMENDED SAVINGS* $159,293 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
01 2.9113: Use solar heat for heat $71,296 $345,600 $71,296
1,005,161
kWh
- - - - -
02 2.3212: Optimize plant power factor $28,035 $28,125 - - $28,035 - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,594 $2,250 $11,943
168,372
kWh
$7,651
-
kW-mo/yr
- - - -
04 3.4116: Meter recycled water (to reduce sewer charges) $11,473 $10,000 - - - - - $11,473
-
Tgal
05 2.2437: Recover waste heat from equipment $10,097 $10,000 - - - $10,097
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,906 $3,825 $2,990
42,152
kWh
$1,916
-
kW-mo/yr
- - - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,896 $1,450 $2,984
42,063
kWh
$1,912
-
kW-mo/yr
- - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,076 $645 $3,076
43,362
kWh
- - - - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,797 $3,000 $1,711
24,129
kWh
$86
-
kW-mo/yr
- - - -
10 2.6218: Turn off equipment when not in use $1,536 - $1,536
21,656
kWh
- - - - -
11 2.8121: Apply for tax-free status for energy purchases $1,173 - - - $1,173 - - -
12 3.4151: Minimize water usage $830 - - - - - $830
-
Tgal
-
13 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $584 $1,125 $584
8,233
kWh
- - - - -
TOTAL RECOMMENDED $159,293 $406,020 $96,120
1,355,128
kWh
$11,565
-
kW-mo/yr
$29,208 $10,097
-
MMBtu
$830
-
Tgal
$11,473
-
Tgal
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs