ITAC Assessment: AM0155
ITAC logo
ITAC Assessment: AM0155
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product COTTON,POLYESTER TEXTILE
NAICS
n/a
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area
n/a
Annual Production 12,500,000
lb
Production Hrs. Annual 8,184
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $722,874 16,329,719
kWh
Natural Gas $101,545 25,328
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,299 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,817 $6,760 $9,657
239,156
kWh
- $1,160
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,290 $11,791 $6,290
190,504
kWh
- -
03 2.4312: Improve lubrication practices $3,070 - $3,070
72,978
kWh
- -
04 2.2414: Use waste heat from hot flue gases to preheat $3,010 $2,980 - $3,010
-
MMBtu
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $2,090 $1,500 - $2,090
-
MMBtu
-
06 2.7111: Reduce illumination to minimum necessary levels $642 $520 $642
19,343
kWh
- -
07 2.2511: Insulate bare equipment $380 $80 $380
11,430
kWh
- -
TOTAL RECOMMENDED $26,299 $23,631 $20,039
533,411
kWh
$5,100
-
MMBtu
$1,160
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs