ITAC Assessment: SJ0017
ITAC logo
ITAC Assessment: SJ0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Metal parts
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $1
M
to 5
M
# of Employees 184
Plant Area 100,000
ft2
Annual Production 10,000
units
Production Hrs. Annual 4,335
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $496,142 2,332,332
kWh
Electricity Demand $251,612 6,760
kW-mo/yr
Natural Gas $44,297 2,308
MMBtu
LPG $19,996 555
MMBtu
TOTAL YEARLY COSTS $812,047
RECOMMENDED SAVINGS* $254,608 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Primary Raw Material Savings
01 2.9114: Use solar heat to make electricty $184,626 $998,282 $171,503
806,222
kWh
$13,123
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,795 - $1,645
7,333
kWh
$150
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,258 $759 $1,258
5,913
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,517 $17 - - - $2,517
05 2.7135: Install occupancy sensors $1,226 $414 $826
3,884
kWh
$400
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $50,102 $51,343 $33,055
155,391
kWh
$17,047
-
kW-mo/yr
- -
07 2.8112: Combine utility meters $6,947 - - - $6,947 -
08 2.2514: Cover open tanks $1,257 - $1,257
5,907
kWh
- - -
09 2.6241: Reduce temperature of process equipment when on standby $4,880 - $4,880
22,492
kWh
- - -
TOTAL RECOMMENDED $254,608 $1,050,815 $214,424
1,007,142
kWh
$30,720
-
kW-mo/yr
$6,947 $2,517
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs