| Assessment Year | 1988 |
|---|---|
| Principal Product | INVESTMENT CASTINGS |
| NAICS |
n/a
|
| SIC | 3324: Steel Investment Foundries |
| Sales Range | $10 M to 50M |
| # of Employees | 155 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $369,344 | 6,024,619 |
kWh
|
$0.061 |
| Natural Gas | $195,152 | 40,578 |
MMBtu
|
$4.81 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $11,904 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,904 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4312: Improve lubrication practices | $7,226 | - |
$7,226
117,819
kWh
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,405 | - |
$1,405
22,860
kWh
|
- | |
| 03 | 2.6121: Reduce hot water temperature to the minimum required | $651 | - |
$651
10,551
kWh
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $1,756 | $500 |
$1,756
28,722
kWh
|
- | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $866 | $1,500 | - |
$866
-
MMBtu
|
|
| TOTAL RECOMMENDED | $11,904 | $2,000 |
$11,038
179,952
kWh
|
$866
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $11,904 | $2,000 |
$11,038
179,952
kWh
|
$866
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs