ITAC Assessment: MI0001
ITAC logo
ITAC Assessment: MI0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Custom made gears
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 28,800
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 4,875
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,324 859,200
kWh
Electricity Demand $21,312 2,669
kW-mo/yr
Electricity Fees $7,533 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $129,306 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $96,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings By-product Production Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,545 $200 - $5,545
-
kW-mo/yr
-
02 2.7233: Use properly designed and sized hvac equipment $24,240 $20,000 n/a $24,240
535,080
kWh
- -
03 3.1191: Change procedures / equipment / operating conditions $96,000 $25,000 - - $96,000
04 2.7447: Install vinyl strip / high speed / air curtain doors $3,041 $1,360 $3,041
67,123
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $480 $60 $480
10,596
kWh
- -
TOTAL RECOMMENDED $129,306 $46,620 $27,761
612,799
kWh
$5,545
-
kW-mo/yr
$96,000
TOTAL IMPLEMENTED $96,480 $25,060 $480
10,596
kWh
- $96,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs