Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

674

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Bolts, nuts, screws, rivets, and washers
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0785 #05 Y:2019 Utilize higher efficiency lamps and/or ballasts $1,470 $460
AM0785 #04 Y:2019 Optimize plant power factor $4,685 $6,865
AM0785 #03 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $7,880 $2,000
AM0785 #02 Y:2019 Utilize higher efficiency lamps and/or ballasts $8,450 $18,920
AM0785 #01 Y:2019 Convert to high volume low pressure (hvlp) paint guns $19,800 $750
MI0354 #11 Y:2019 Close holes and openings in building such as broken windows $218 $559
MI0354 #10 Y:2019 Use proper thickness of insulation on building envelope $538 $951
MI0354 #09 Y:2019 Use solar heat to heat water $601 $2,205
MI0354 #08 Y:2019 Use photocell controls $1,366 $2,206
MI0354 #07 Y:2019 Air condition only space necessary $1,687 $240
MI0354 #06 Y:2019 Install occupancy sensors $2,156 $2,559
MI0354 #05 Y:2019 Install vinyl strip / high speed / air curtain doors $2,590 $8,800
MI0354 #04 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $11,262 $29,820
MI0354 #03 Y:2019 Turn off equipment when not in use $12,789 $3,600
MI0354 #02 Y:2019 Utilize higher efficiency lamps and/or ballasts $23,459 $80,434
MI0354 #01 Y:2019 Clean or color roof to reduce solar load $42,517 $105,476
WV0561 #08 Y:2018 Reduce the pressure of compressed air to the minimum required $321 $34
WV0561 #07 Y:2018 Develop a repair/replace policy $471 $696
WV0561 #06 Y:2018 Minimize water usage $535 $1,400
WV0561 #05 Y:2018 Reschedule plant operations or reduce load to avoid peaks $1,253 $6,000