ITAC Assessment: WV0561
ITAC logo
ITAC Assessment: WV0561
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Nuts, Bolts and Screws
NAICS 332722: Bolt, Nut, Screw, Rivet, and Washer Manufacturing
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $5
M
to 10
M
# of Employees 10
Plant Area 200,000
ft2
Annual Production 480,000
units
Production Hrs. Annual 2,040
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,850 1,088,744
kWh
Electricity Demand $33,271 4,674
kW-mo/yr
Natural Gas $108,555 14,418
MMBtu
Waste Disposal Costs
Water Usage $245 41
Tgal
Water Disposal $367 41
Tgal
TOTAL YEARLY COSTS $219,288
RECOMMENDED SAVINGS* $29,196 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,943

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Administrative Changes Savings
01 2.6232: Install set-back timers $15,007 $2,522 $1,641
23,244
kWh
- $13,366
-
MMBtu
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,102 $13,629 $5,603
79,360
kWh
$2,499
-
kW-mo/yr
- - - -
03 2.4239: Eliminate or reduce compressed air usage $1,765 $1,784 $1,110
15,721
kWh
$655
-
kW-mo/yr
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,742 $171 $1,094
15,492
kWh
$648
-
kW-mo/yr
- - - -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,253 $6,000 - $1,253
-
kW-mo/yr
- - - -
06 3.4151: Minimize water usage $535 $1,400 - - - $245
-
Tgal
$367
-
Tgal
$(-77.0)
07 2.4151: Develop a repair/replace policy $471 $696 $466
6,605
kWh
$278
-
kW-mo/yr
- - - $(-273.0)
08 2.4231: Reduce the pressure of compressed air to the minimum required $321 $34 $200
2,828
kWh
$121
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $29,196 $26,236 $10,114
143,250
kWh
$5,454
-
kW-mo/yr
$13,366
-
MMBtu
$245
-
Tgal
$367
-
Tgal
$(-350.0)
TOTAL IMPLEMENTED $27,943 $20,236 $10,114
143,250
kWh
$4,201
-
kW-mo/yr
$13,366
-
MMBtu
$245
-
Tgal
$367
-
Tgal
$(-350.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs