| Assessment Year | 1993 |
|---|---|
| Principal Product | Furniture Frames |
| NAICS |
n/a
|
| SIC | 2426: Hardwood Dimension and Flooring Mills |
| Sales Range | $5 M to 10M |
| # of Employees | 77 |
| Plant Area |
n/a
|
| Annual Production | 294,000
pieces
|
| Production Hrs. Annual | 5,635
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $212,947 | 2,987,104 |
kWh
|
$0.071 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,699 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,840 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,762 | $15,398 |
$3,762
52,755
kWh
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $409 | $2,106 |
$409
5,862
kWh
|
|
| 03 | 2.7122: Disconnect ballasts | $1,200 | $1,315 |
$1,200
16,999
kWh
|
|
| 04 | 2.4133: Use most efficient type of electric motors | $637 | $600 |
$637
9,086
kWh
|
|
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $508 | $200 |
$508
7,034
kWh
|
|
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,640 | $950 |
$1,640
22,860
kWh
|
|
| 07 | 2.4133: Use most efficient type of electric motors | $1,410 | $7,410 |
$1,410
19,637
kWh
|
|
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,652 | $1,650 |
$1,652
23,154
kWh
|
|
| 09 | 2.6231: Utilize controls to operate equipment only when needed | $657 | $1,000 |
$657
9,379
kWh
|
|
| 10 | 3.1191: Change procedures / equipment / operating conditions | $2,824 | - |
$2,824
39,566
kWh
|
|
| TOTAL RECOMMENDED | $14,699 | $30,629 |
$14,699
206,332
kWh
|
||
| TOTAL IMPLEMENTED | $2,840 | $2,265 |
$2,840
39,859
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs