Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Milk powder, butter, condensed milk, bulk milk
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 80
Plant Area 40,000
ft2
Annual Production 106,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $592,925 15,264,000
kWh
Electricity Demand $398,540 28,413
kW-mo/yr
Electricity Fees $116,996 -
Natural Gas $543,168 107,470
MMBtu
Fuel Oil #6 $145,240 33,485
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #6 Savings Water Consumption Savings
01 2.1331: Burn a less expensive grade of fuel $14,400 - - - $86,700
-
MMBtu
$(-72,300.0)
-
MMBtu
-
02 2.2414: Use waste heat from hot flue gases to preheat $8,000 $40,000 n/a - - $3,900
-
MMBtu
$4,100
-
MMBtu
-
03 2.2121: Increase amount of condensate returned $4,000 $12,000 - - $1,600
-
MMBtu
$1,700
-
MMBtu
$700
-
Tgal
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,000 - $4,000
97,000
kWh
- - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,100 $10,000 $1,500
37,000
kWh
$1,600
-
kW-mo/yr
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,800 - $2,800
68,000
kWh
- - - -
07 2.2511: Insulate bare equipment $2,300 $10,000 - - $1,100
-
MMBtu
$1,200
-
MMBtu
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,000 - $1,000
24,000
kWh
- - - -
09 2.2123: Insulate feedwater tank $800 $2,000 - - $400
-
MMBtu
$400
-
MMBtu
-
TOTAL RECOMMENDED $40,400 $74,000 $9,300
226,000
kWh
$1,600
-
kW-mo/yr
$93,700
-
MMBtu
$(-64,900.0)
-
MMBtu
$700
-
Tgal
TOTAL IMPLEMENTED $18,000 $34,000 $9,300
226,000
kWh
$1,600
-
kW-mo/yr
$3,100
-
MMBtu
$3,300
-
MMBtu
$700
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #6 Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs