Assessment Year | 2001 |
---|---|
Principal Product | Milk powder, butter, condensed milk, bulk milk |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $50 M to 100M |
# of Employees | 80 |
Plant Area |
40,000
ft2
|
Annual Production | 106,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $592,925 | 15,264,000 |
kWh
|
$0.039 |
Electricity Demand | $398,540 | 28,413 |
kW-mo/yr
|
$14.03 |
Electricity Fees | $116,996 | - |
|
- |
Natural Gas | $543,168 | 107,470 |
MMBtu
|
$5.05 |
Fuel Oil #6 | $145,240 | 33,485 |
MMBtu
|
$4.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,400 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,000 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #6 Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1331: Burn a less expensive grade of fuel | $14,400 | - | - | - |
$86,700
-
MMBtu
|
$(-72,300.0)
-
MMBtu
|
- | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $8,000 | $40,000 | n/a | - | - |
$3,900
-
MMBtu
|
$4,100
-
MMBtu
|
- |
03 | 2.2121: Increase amount of condensate returned | $4,000 | $12,000 | - | - |
$1,600
-
MMBtu
|
$1,700
-
MMBtu
|
$700
-
Tgal
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,000 | - |
$4,000
97,000
kWh
|
- | - | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,100 | $10,000 |
$1,500
37,000
kWh
|
$1,600
-
kW-mo/yr
|
- | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,800 | - |
$2,800
68,000
kWh
|
- | - | - | - | |
07 | 2.2511: Insulate bare equipment | $2,300 | $10,000 | - | - |
$1,100
-
MMBtu
|
$1,200
-
MMBtu
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,000 | - |
$1,000
24,000
kWh
|
- | - | - | - | |
09 | 2.2123: Insulate feedwater tank | $800 | $2,000 | - | - |
$400
-
MMBtu
|
$400
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $40,400 | $74,000 |
$9,300
226,000
kWh
|
$1,600
-
kW-mo/yr
|
$93,700
-
MMBtu
|
$(-64,900.0)
-
MMBtu
|
$700
-
Tgal
|
||
TOTAL IMPLEMENTED | $18,000 | $34,000 |
$9,300
226,000
kWh
|
$1,600
-
kW-mo/yr
|
$3,100
-
MMBtu
|
$3,300
-
MMBtu
|
$700
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #6 Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs