Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Bolts, nuts, screws, rivets, and washers
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0212 #05 Y:2025 Repair and eliminate steam leaks $9,826 $39,500
IP0212 #04 Y:2025 Eliminate or reduce compressed air usage $29,292 $84,000
IP0212 #03 Y:2025 Install occupancy sensors $914 $593
IP0212 #02 Y:2025 Reduce space conditioning during non-working hours $35,687 $360
IP0212 #01 Y:2025 Conserve energy by efficient use of vending machines $1,010 -
IC0139 #14 Y:2008 Utilize higher efficiency lamps and/or ballasts $833 $231
IC0139 #13 Y:2008 Conserve energy by efficient use of vending machines $779 -
IC0139 #12 Y:2008 Lower temperature during the winter season and vice-versa $4,079 -
IC0139 #11 Y:2008 Convert combustion equipment to burn oil $7,860 $23,865
IC0139 #10 Y:2008 Insulate bare equipment $2,623 $1,416
IC0139 #09 Y:2008 Insulate glazing, walls, ceilings, and roofs $92 $269
IC0139 #08 Y:2008 Use most efficient type of electric motors $2,303 $6,227
IC0139 #07 Y:2008 Utilize higher efficiency lamps and/or ballasts $19,058 $103,849
IC0139 #06 Y:2008 Install occupancy sensors $1,834 $4,703
IC0139 #05 Y:2008 Utilize higher efficiency lamps and/or ballasts $811 $211
IC0139 #04 Y:2008 Utilize higher efficiency lamps and/or ballasts $4,435 $15,346
IC0139 #03 Y:2008 Upgrade controls on compressors $22,414 $12,440
IC0139 #02 Y:2008 Eliminate or reduce compressed air usage $1,407 $3,105
IC0139 #01 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $2,308 $2,645
ND0366 #04 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $2,250 $160