Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,108

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Screw machine products, and bolts, nuts, screws, rivets, and washers
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0479 #06 Y:2026 Optimize plant power factor $25,380 $72,124
MI0479 #05 Y:2026 Utilize higher efficiency lamps and/or ballasts $6,360 $16,755
MI0479 #04 Y:2026 Install occupancy sensors $2,629 $3,761
MI0479 #03 Y:2026 Replace existing hvac unit with high efficiency model $33,391 $16,984
MI0479 #02 Y:2026 Eliminate or reduce compressed air usage $2,569 $185
MI0479 #01 Y:2026 Use solar heat to make electricty $623,934 $2,300
MI0477 #06 Y:2026 Optimize plant power factor $4,509 $19,466
MI0477 #05 Y:2026 Change rate schedules or other changes in utility service $96 $104
MI0477 #04 Y:2026 Close holes and openings in building such as broken windows $657 $396
MI0477 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $23,136 $1,886
MI0477 #02 Y:2026 Use solar heat to make electricty $41,053 $1,380
MI0477 #01 Y:2026 Eliminate or reduce compressed air usage $20,746 $185
LE0616 #06 Y:2026 Install compressor air intakes in coolest locations $1,024 $4,000
LE0616 #05 Y:2026 Use solar heat to heat water $42,290 $125,212
LE0616 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,850 $4,000
LE0616 #03 Y:2026 Reschedule plant operations or reduce load to avoid peaks $2,401 $2,000
LE0616 #02 Y:2026 Install timers and/or thermostats $603 -
LE0616 #01 Y:2026 Reduce the pressure of compressed air to the minimum required $3,281 -
MU0085 #08 Y:2026 Close holes and openings in building such as broken windows $41 $32
MU0085 #07 Y:2026 Close holes and openings in building such as broken windows $6,179 $6